Join us for our luncheon on February 3, 2020, featuring Ross Webb, Project Manager, SAK Construction.  

Project Presentation: The San Antonio Water System (SAWS) W-6 Upper Segment: Highway 90 to W Military Drive Sewer Main project is a sanitary sewer replacement project located on the west side of San Antonio, TX.  Designed by Kimley-Horn & Associates and Brierley Associates, along with team members JQ Infrastructure, and K. Friese & Associates. 

The proposed alignment extends approximately along Highway 90 and Military Drive and consists of replacing 19,000 linear feet of 54-inch sanitary sewer with about 29,190 linear feet of 60-inch, 78-inch, and 104-inch gravity sewer pipelines. Approximately 500 linear feet of pipe are anticipated to be installed through open trenching, 900 linear feet by means of hand tunneling, and 27,800 linear feet will be installed through deep tunneling with a TBM. A total of 9 shafts will be located along the alignment.

 
Ross Webb
 * limited to the first 40 registrants. Social distancing and safety guidelines will be in place. 
Special Thanks to our Luncheon Sponsors: 
 
 .     

© 2019 UCTA | Underground Construction Technology Association